Baker full 2Baker fullWamberal nearly finished, the blue water is exactly what the customer wanted and doing a 16m flow over that cant be 1mm out of level was no easy task so well done Joe every tile was flowing. After the lid, riverstones and landscaping are complete this could be another of our award winners, We have loved the challenge of this job and look forward to seeing the 7 LED remote controlled lights on at night. If you look closely enough you will see Max doing his final inspection.