Natalie

About Natalie

This author has not yet filled in any details.
So far Natalie has created 22 blog entries.

Spray day at Forder

Big spray with two lines pumping at the same time so it all goes off the same time, and out of all days, a cherry-picker truck falls over blocking the street leaving no access to the property. At one stage we had three concrete trucks in the back yard waiting to get out. After making [...]

By |2018-05-25T10:05:08+10:00March 10th, 2013|Pool Construction Sydney|Comments Off on Spray day at Forder

Pre plumb Forder

Pre plumb going at Bruce and Jenny's, you can see the amount of steel gone into this job. the base has to be on the same purchase throughout the pool then strengthened. I think we used about 50m of pipe to do the pre plumb on this all in 50mm for water flow.

By |2018-05-25T10:05:08+10:00March 10th, 2013|Swimming Pools Sydney|Comments Off on Pre plumb Forder

Steel done Mecer

Donna and Tony live on the water at Saratoga so water table comes into play, we are lucky the pool is up level with the deck. We have our own way to do water table jobs but love it if we can avoid it, nice job done by Pauls team.

By |2018-05-25T10:05:08+10:00March 10th, 2013|Swimming Pools Sydney|Comments Off on Steel done Mecer

Spray Twoomy

Spray at the Twoomy's Mal and the boys/Girl casual on a saturday morning, three jet on the beach should keep the kids happy and a nice place for a chardy  

By |2018-05-25T10:05:08+10:00March 10th, 2013|Swimming Pools Sydney|Comments Off on Spray Twoomy

Anderson shell done

Spray went well at Anderson, this pool has some return lines in the floor which help with heating. Max the border collie gives his stamp of approval.

By |2018-05-25T10:05:08+10:00March 10th, 2013|Swimming Pools Sydney|Comments Off on Anderson shell done

Shell done at Seaman

This one is going to be a beuty, the pool is in the bottom story with with glass above it to let in light from the floor above. We have waterfalls in the slab above so you will be able to walk over the glass and over the waterfall, should look and sound amazing.

By |2018-05-25T10:05:08+10:00March 10th, 2013|Swimming Pools Sydney|Comments Off on Shell done at Seaman

Starting Forder

Jerry starting the dig at Jenny and Bruce Forder's house this is a big job because of the big walkways, 10m flow over and spa all connected together with piering everywhere.

By |2018-05-25T10:05:08+10:00March 10th, 2013|Swimming Pools Sydney|Comments Off on Starting Forder

Steel Anderson

Young Skipper in the hole putting in the reo,a bit of formwork needed as there was a bit of sand around the old pool were theold pool was back filled.

By |2018-05-25T10:05:08+10:00March 10th, 2013|Swimming Pools Sydney|Comments Off on Steel Anderson

Starting Twoomy

Starting Shivon and Dennis Twoomy's freeform pool. Dennis owns his own excavation business so we are measuring and supervising the dig, a very good job done by the boys but i don't think they realised how precise you have to be for a swimming pool, a cold beer provided by Dennis and a neat hole [...]

By |2018-05-25T10:05:08+10:00March 10th, 2013|Swimming Pools Sydney|Comments Off on Starting Twoomy
Go to Top